Calculator 01

Cost estimator

Two questions give you the ballpark for free. The itemized, site-specific number takes a contractor — and that's the second half of this page.

Both tiers use 2025–2026 market figures and output ranges, never single false-precision numbers. Neither is a quote: only a licensed contractor standing on your property can price the job. The full cost model is in the cost guide.

Step 1 · free, no details needed

The ballpark

Tank size and whether it's buried. That's enough to know which order of magnitude you're in.

Basic

Step 2 · the itemized breakdown

The detailed estimate

Add your site conditions and we'll itemize every driver — access, depth, county soil and groundwater, residual contents, sampling, and the separate remediation tier if a leak is in play. This version is specific enough to act on, which is why we ask for a way to reach you: a person here reads it and comes back to you within one business day. We are not contractors and we don't set prices — the number you can act on comes from someone who has stood on your property.

What you get, what we ask

You get the full itemized breakdown on this page, immediately. We ask for a name, a phone number, and your permission to reply. We don't charge homeowners and we don't sell your details. Nobody contacts you at all unless the box below is ticked.

Tank
Site

So we know which state and territory your property sits in.

Where we reach you

How the estimate is built

The base range for an underground removal with clean soil is $1,500 – $3,500. The calculator adds documented drivers on top: under-slab access adds $500 – $1,500 in cutting and restoration; rocky or compact soil (common in Morris, Somerset, and Hunterdon counties) and high groundwater (coastal Monmouth, low-lying Hudson) each add 10–25%; residual contents add extraction and disposal labor; the municipal permit adds $50 – $500. The excavation itself is capped at $5,000 — however those access and soil drivers stack, a clean removal tops out around there, and the estimator says so on the line where the cap applies. Sampling, residual contents and the permit sit on top of that figure, so a difficult site with sampling and sludge can still total more.

What the estimator will not do is fold a leak into the number. A confirmed or suspected leak is a different scope under state environmental oversight, so it appears as its own flagged tier. If that's your situation, read the suspected-leak page and run the leak-likelihood estimator first.

See what you're paying to remove

The interactive cross-section shows the tank these numbers describe: how deep it sits, what the fill and vent pipes are, and what four decades in wet soil do to bare steel. It's the clearest way to understand why access and soil condition — not gallons — drive the price.